(866) 332-0319
Remodeled primary bathroom with freestanding tub, frameless glass shower and oak vanity
Home / Bathroom Remodeling / North Carolina

Bathroom Remodeling in North Carolina

We cover 134 North Carolina towns. Prices here run close to the US average.

$14,700–$31,500typical cost of a mid-range remodel
1991median year homes were built
14.4%residents age 65+
$310,000median home value
North Carolina pricing

What North Carolina homeowners pay

Refresh

$6,400 – $13,800 installed

Same layout. New vanity, toilet, fixtures, lighting, paint and a tub or shower surround.

Mid-range remodel

$14,700 – $31,500 installed

Down to studs. New tile floor and shower walls, tub-to-shower conversion, fan, updated supply lines.

Upscale primary bath

$34,400 – $78,700 installed

Layout changes, curbless shower, double vanity, heated floor, custom glass and stone.

Licensing

Hiring a contractor in North Carolina

Projects above the state threshold need a contractor licensed by the NC Licensing Board for General Contractors; plumbing is licensed separately.

  • Verify the license or registration on the state lookup and match the name on the estimate.
  • Ask for a certificate of general liability insurance and workers' comp, sent directly from the insurer.
  • Get a written, line-item estimate: demo, plumbing, waterproofing, tile, fixtures, permit.
  • Ask who pulls the permit. It should be the contractor, in their name.
Bathroom Remodeling project in North Carolina

Free bathroom remodel quote in North Carolina

A licensed installer near you measures and prices the job at no cost.

(866) 332-0319

FAQ

How much does a bathroom remodel cost in North Carolina?

Across North Carolina, a mid-range remodel typically costs $14,700 – $31,500, and simpler jobs start near $6,400. Statewide, prices run close to the US average; big metro areas are higher than small towns.

Do North Carolina bathroom contractors need a license?

Projects above the state threshold need a contractor licensed by the NC Licensing Board for General Contractors; plumbing is licensed separately.

How long does it take?

Plan on 3 to 6 weeks of on-site work once demo starts. The schedule usually depends on the plumbing inspection and on special-order items like glass and vanities.

Do I need a permit?

Usually yes if plumbing, electrical, framing or ventilation changes. Swapping a vanity or toilet in the same spot usually does not. The contractor should pull the permit. If they ask you to pull it as the owner, that is a red flag.

Does a bathroom remodel add value?

At resale, a mid-range bath remodel usually gets back somewhere around two-thirds of what it cost, depending on the market. The bigger effect is speed of sale: buyers walk away from dated or water-stained bathrooms, and they notice the shower and vanity first.

Free estimate:(866) 332-0319